Business Overview
Engaging in construction industry for over 30 years in Hong Kong, Kwan On is a prestigious construction company with the capabilities of undertaking mega complex construction projects for public and private sectors. We are the Approved Contractor for Public Work and Approved Supplier of Materials and Specialist Contractor for Public Work under the Development Bureau. With our expertise in various scopes and experienced management team, the Group has delivered high quality project works across the territories. We have well received recognition among the sector as well as merits and rewards from public and private organizations.
Upholding our principle of the clients' satisfaction first, Kwan On will enhance its technologies, actively diversify its business, focus on improving human resources and broaden its client base with an aim to boost the development of the Group.
-
Long term Prevention and Control of Landslip Project Group M - North Lantau Landslip Prevention and Control Project in 2008
The project includes a landslide risk reduction project for 13 natural slopes in the north of Lantau Island.
+more
GE/2013/17
-
Long term prevention and control of landslides project Group J of 2008- New Territories prevention and control of landslides project
Consolidating 5 government slopes and retaining walls in the New Territories and mitigating the risk of landslides on 10 natural slopes.
+more
GE/2013/06
-
Replacement and repair of water pipe works Phase 4 Phase 2- Islands District water pipe works
Replace the aged water pipes in the Islands District to improve the condition of the water supply network.
+more
15/WSD/11
-
Kai Tak Development - North Front Apron Phase 4 Infrastructure
+more
KL/2012/03
-
Demolition of Block B, the former Kennedy Town Married Police Dormitory in Kennedy Town, Hong Kong
NA
+more
SDB807
-
Expansion of Butterfly Valley Fresh Water Main Distribution Reservoir and laying of relevant water pipes
Expand the storage capacity of the existing Butterfly Valley main drinking water distribution reservoir from 40000 cubic meters to 120000 cubic meters; And the laying of relevant water pipes in Sham Shui Po and Kowloon City with a length of about 900 met
+more
4/WSD/11 JV
-
Long term Landslip Control Plan 2009 Group C - Landslip Control Works on Lantau Island and Hei Ling Chau
Carry out consolidation works for 1 government slope and 14 natural slopes on Lantau Island and Hei Ling Chau to mitigate landslip risk.
+more
GE/2012/11
-
Tai Po Pak Shek Kok Reclamation Water Supply Scheme - Phase 2, Phase 2
A food water pipe with a length of approximately 2.1 kilometers and a diameter of 600 millimeters is laid between Banchun Garden in Tai Po and Shantang New Village.
+more
9/WSD/13 JV
-
Replacement and repair of water pipe works Phase 4 Phase 2- Islands District water pipe works
Replace the aged water pipes in the Islands District to improve the condition of the water supply network.
+more
15/WSD/11
-
Expansion of Butterfly Valley Fresh Water Main Distribution Reservoir and laying of relevant water pipes
Expand the storage capacity of the existing Butterfly Valley main drinking water distribution reservoir from 40000 cubic meters to 120000 cubic meters; And the laying of relevant water pipes in Sham Shui Po and Kowloon City with a length of about 900 met
+more
4/WSD/11 JV
-
Tai Po Pak Shek Kok Reclamation Water Supply Scheme - Phase 2, Phase 2
A food water pipe with a length of approximately 2.1 kilometers and a diameter of 600 millimeters is laid between Banchun Garden in Tai Po and Shantang New Village.
+more
9/WSD/13 JV
-
Kai Tak Development - North Front Apron Phase 4 Infrastructure
+more
KL/2012/03
-
Demolition of Block B, the former Kennedy Town Married Police Dormitory in Kennedy Town, Hong Kong
NA
+more
SDB807
-
Long term Prevention and Control of Landslip Project Group M - North Lantau Landslip Prevention and Control Project in 2008
The project includes a landslide risk reduction project for 13 natural slopes in the north of Lantau Island.
+more
GE/2013/17
-
Long term prevention and control of landslides project Group J of 2008- New Territories prevention and control of landslides project
Consolidating 5 government slopes and retaining walls in the New Territories and mitigating the risk of landslides on 10 natural slopes.
+more
GE/2013/06
-
Long term Landslip Control Plan 2009 Group C - Landslip Control Works on Lantau Island and Hei Ling Chau
Carry out consolidation works for 1 government slope and 14 natural slopes on Lantau Island and Hei Ling Chau to mitigate landslip risk.
+more
GE/2012/11