Expansion of Butterfly Valley Fresh Water Main Distribution Reservoir and laying of relevant water pipes
Completed
Contract number 4/WSD/11 JV
Contract time :2013/9/1-2017/6/1
Contract amount :HK$336,440,245.46
Scope of Work : Expand the storage capacity of the existing Butterfly Valley main drinking water distribution reservoir from 40000 cubic meters to 120000 cubic meters; And the laying of relevant water pipes in Sham Shui Po and Kowloon City with a length of about 900 met