Our Projects

Business Overview

Engaging in construction industry for over 30 years in Hong Kong, Kwan On is a prestigious construction company with the capabilities of undertaking mega complex construction projects for public and private sectors. We are the Approved Contractor for Public Work and Approved Supplier of Materials and Specialist Contractor for Public Work under the Development Bureau. With our expertise in various scopes and experienced management team, the Group has delivered high quality project works across the territories. We have well received recognition among the sector as well as merits and rewards from public and private organizations. Upholding our principle of the clients' satisfaction first, Kwan On will enhance its technologies, actively diversify its business, focus on improving human resources and broaden its client base with an aim to boost the development of the Group.
  • Development of Andashen Road Quarry Land - Pedestrian Link Facility Project Phase 1

    The project mainly constructs pedestrian connection facilities including pedestrian overpass, lift tower and escalator in Kwun Tong District; Construction of bus transfer stations at the toll plaza of the Tseung Kwan O Tunnel; Carry out slope improvement
    +more

    NE/2016/05
  • Survey and restoration of underground sewage and rainwater channels - Phase 1

    The project includes surveying approximately 110 kilometers of underground sewage, rainwater, covered open channels, and related manholes throughout Hong Kong, as well as repairing approximately 18 kilometers of underground sewage and rainwater channels
    +more

    DC/2018/10
  • Slope maintenance and improvement project fixed-term contract

    The contract specifies the maintenance and improvement of slopes and retaining structures within Zone A (including natural slope mitigation), the detection and reporting of leaks in underground water transmission services, and the repair and renovation o
    +more

    HA20219051
  • Civil Engineering Contract for Replacing Tram Tracks

    NA
    +more

    HKT0041
  • Provide clear passage facilities for pedestrian overpasses, elevated pedestrian walkways, and pedestrian tunnels - Group 4, First Contract

    Construction of 19 additional lifts for 11 footbridges, an elevated walkway and a pedestrian tunnel in East District, Kowloon City District, Kwun Tong District, Sham Shui Po District District and Wong Tai Sin District; Relevant civil engineering, Geotech
    +more

    HY/2018/12
  • Sha Tin Ma On Shan Road Improvement Project

    Road improvement and related projects include the construction of sound barriers and drainage channels, sewage and water pipe connections, improvement and related projects.
    +more

    HA20170102
  • Hong Kong and outlying islands risk based water pipe improvement fixed-term contract

    Replace and repair aged water pipes located in Sha Tin and Sai Kung to improve the condition of the water supply network.
    +more

    2/WSD/21 JV
  • Slope Maintenance and Improvement Project Term Contract (2019-2022) Zone B

    The slope maintenance and improvement works (including land survey), water leakage inspection and maintenance works determined by the Geotechnical engineering regular service provider through slope inspection and stability evaluation, as well as the emer
    +more

    HA20189126
  • Hong Kong and outlying islands risk based water pipe improvement fixed-term contract

    Replace and repair aged water pipes located in Sha Tin and Sai Kung to improve the condition of the water supply network.
    +more

    2/WSD/21 JV
  • Consolidation works for about 4 government slopes and retaining walls on Hong Kong Island and the New Territories, and landslip risk mitigation works for about 14 natural slopes

    Mainly carrying out reinforcement works for four slopes and retaining walls located on Hong Kong Island and the New Territories; And carry out terrain reduction engineering for 14 natural mountain slopes.
    +more

    GE/2018/01
  • Consolidation of 10 government slopes and retaining walls on Lantau Island and Hong Kong Island and mitigation of landslip risk on 24 natural slopes

    Consolidation works were carried out for 10 government slopes and retaining walls on Lantau Island and Hong Kong Island, and landslip risk mitigation works were carried out for 24 natural slopes.
    +more

    GE/2018/03
  • Drainage maintenance and construction works on Hong Kong Island and Islands District (2017 to 2021)

    NA
    +more

    DC/2017/04 JV
  • Water Works Term Contract, Region L - Lantau and outlying islands

    NA
    +more

    1/WSD/17(L) JV
  • Provide clear passage facilities for road structures - Group 1, 2nd contract

    Construction of 15 additional lifts for 10 existing pedestrian overpasses located in Central West District, Wan Chai District District, East District, South District, Kowloon City District, Kwun Tong District and Yau Tsim Mong District; Construction relat
    +more

    CV/2015/01
  • Long term Prevention and Control of Landslip Project Group M - North Lantau Landslip Prevention and Control Project in 2008

    The project includes a landslide risk reduction project for 13 natural slopes in the north of Lantau Island.
    +more

    GE/2013/17
  • Long term prevention and control of landslides project Group J of 2008- New Territories prevention and control of landslides project

    Consolidating 5 government slopes and retaining walls in the New Territories and mitigating the risk of landslides on 10 natural slopes.
    +more

    GE/2013/06
  • Replacement and repair of water pipe works Phase 4 Phase 2- Islands District water pipe works

    Replace the aged water pipes in the Islands District to improve the condition of the water supply network.
    +more

    15/WSD/11
  • Kai Tak Development - North Front Apron Phase 4 Infrastructure

    +more

    KL/2012/03
  • Demolition of Block B, the former Kennedy Town Married Police Dormitory in Kennedy Town, Hong Kong

    NA
    +more

    SDB807
  • Expansion of Butterfly Valley Fresh Water Main Distribution Reservoir and laying of relevant water pipes

    Expand the storage capacity of the existing Butterfly Valley main drinking water distribution reservoir from 40000 cubic meters to 120000 cubic meters; And the laying of relevant water pipes in Sham Shui Po and Kowloon City with a length of about 900 met
    +more

    4/WSD/11 JV
  • Long term Landslip Control Plan 2009 Group C - Landslip Control Works on Lantau Island and Hei Ling Chau

    Carry out consolidation works for 1 government slope and 14 natural slopes on Lantau Island and Hei Ling Chau to mitigate landslip risk.
    +more

    GE/2012/11
  • Tai Po Pak Shek Kok Reclamation Water Supply Scheme - Phase 2, Phase 2

    A food water pipe with a length of approximately 2.1 kilometers and a diameter of 600 millimeters is laid between Banchun Garden in Tai Po and Shantang New Village.
    +more

    9/WSD/13 JV
  • Main infrastructure projects related to the proposed development project in Tung Chung District 56

    Construct a section of carriageway, a Bike lane, a pedestrian path, a relevant roundabout, a channel, auxiliary pedestrian crossing facilities, two refuge places, flower troughs, and carry out ancillary works such as civil engineering, drainage, sewage, w
    +more

    HA20130375
  • Long term Prevention and Control of Landslip Project Group N in 2008- Prevention and Control of Landslip Projects in Deep Bend, Tai O East, Upper Qiang Mountain, and Qiang Shan Road East of West Lantau Island

    NA
    +more

    GE/2013/16
  • Providing Accessible Channel Facilities for Road Structures - Phase 3, 6th Contract

    Construction of 14 lifts and one ramp for six existing footbridges and five existing pedestrian tunnels at eleven locations in North District, Sai Kung District, Sha Tin District, Tai Po District, Tsuen Wan District and Tuen Mun District; And constructio
    +more

    HY/2014/12 JV
  • Additional noise barrier works of Tuen Mun Road (downtown section)

    Set up sound barriers and covers along Tuen Mun Road (downtown section), and carry out relevant drainage, roads, relocation of public facilities, street lighting, auxiliary traffic facilities and environmental beautification works. The project is expected
    +more

    HY/2013/19 JV
  • Land Leveling and Infrastructure Construction Works at Liantang/Heung Yuen Wai Port - Project Contract 7

    Four vehicular bridges and one pedestrian bridge across Sham Chun River within the Hong Kong Special Administrative Region.
    +more

    NE/2014/03 JV
  • West Kowloon Cultural District Infrastructure Project Phase 1 (Group 1)

    A small but important public infrastructure project to connect with the phased development of the West Kowloon Plan, especially in conjunction with the opening of other facilities in the park, opera center, M+, and art square development area.
    +more

    GW/2015/05/038
  • Construction of additional noise barriers on Tuen Mun Road (Tiger Section)

    The project includes setting up sound barriers and covers along Tuen Mun Road (Tiger lot) and carrying out related drainage, road, soil, relocation of public facilities, street lighting, auxiliary traffic facilities and environmental beautification works
    +more

    HY/2014/14 JV
  • Provide clear passage facilities for road structures - Group 1, 3rd contract

    The project includes the construction of 13 additional lifts and a ramp for seven existing pedestrian overpasses located in South District, Kowloon City District, Kwun Tong District, Sham Shui Po District District and Wong Tai Sin District; Construction
    +more

    CV/2015/08 JV
  • Leveling approximately 1.5 hectares of land and carrying out related infrastructure projects in the 29th district of the Gudong North New Development Zone

    NA
    +more

    NE/2016/04
  • Survey and restoration of underground sewage and rainwater channels - Phase 1

    The project includes surveying approximately 110 kilometers of underground sewage, rainwater, covered open channels, and related manholes throughout Hong Kong, as well as repairing approximately 18 kilometers of underground sewage and rainwater channels
    +more

    DC/2018/10
  • Slope maintenance and improvement project fixed-term contract

    The contract specifies the maintenance and improvement of slopes and retaining structures within Zone A (including natural slope mitigation), the detection and reporting of leaks in underground water transmission services, and the repair and renovation o
    +more

    HA20219051
  • Civil Engineering Contract for Replacing Tram Tracks

    NA
    +more

    HKT0041
  • Provide clear passage facilities for pedestrian overpasses, elevated pedestrian walkways, and pedestrian tunnels - Group 4, First Contract

    Construction of 19 additional lifts for 11 footbridges, an elevated walkway and a pedestrian tunnel in East District, Kowloon City District, Kwun Tong District, Sham Shui Po District District and Wong Tai Sin District; Relevant civil engineering, Geotech
    +more

    HY/2018/12
  • Sha Tin Ma On Shan Road Improvement Project

    Road improvement and related projects include the construction of sound barriers and drainage channels, sewage and water pipe connections, improvement and related projects.
    +more

    HA20170102
  • Drainage maintenance and construction works on Hong Kong Island and Islands District (2017 to 2021)

    NA
    +more

    DC/2017/04 JV
  • Provide clear passage facilities for road structures - Group 1, 2nd contract

    Construction of 15 additional lifts for 10 existing pedestrian overpasses located in Central West District, Wan Chai District District, East District, South District, Kowloon City District, Kwun Tong District and Yau Tsim Mong District; Construction relat
    +more

    CV/2015/01
  • Providing Accessible Channel Facilities for Road Structures - Phase 3, 6th Contract

    Construction of 14 lifts and one ramp for six existing footbridges and five existing pedestrian tunnels at eleven locations in North District, Sai Kung District, Sha Tin District, Tai Po District, Tsuen Wan District and Tuen Mun District; And constructio
    +more

    HY/2014/12 JV
  • Additional noise barrier works of Tuen Mun Road (downtown section)

    Set up sound barriers and covers along Tuen Mun Road (downtown section), and carry out relevant drainage, roads, relocation of public facilities, street lighting, auxiliary traffic facilities and environmental beautification works. The project is expected
    +more

    HY/2013/19 JV
  • Construction of additional noise barriers on Tuen Mun Road (Tiger Section)

    The project includes setting up sound barriers and covers along Tuen Mun Road (Tiger lot) and carrying out related drainage, road, soil, relocation of public facilities, street lighting, auxiliary traffic facilities and environmental beautification works
    +more

    HY/2014/14 JV
  • Provide clear passage facilities for road structures - Group 1, 3rd contract

    The project includes the construction of 13 additional lifts and a ramp for seven existing pedestrian overpasses located in South District, Kowloon City District, Kwun Tong District, Sham Shui Po District District and Wong Tai Sin District; Construction
    +more

    CV/2015/08 JV
  • Hong Kong and outlying islands risk based water pipe improvement fixed-term contract

    Replace and repair aged water pipes located in Sha Tin and Sai Kung to improve the condition of the water supply network.
    +more

    2/WSD/21 JV
  • Hong Kong and outlying islands risk based water pipe improvement fixed-term contract

    Replace and repair aged water pipes located in Sha Tin and Sai Kung to improve the condition of the water supply network.
    +more

    2/WSD/21 JV
  • Water Works Term Contract, Region L - Lantau and outlying islands

    NA
    +more

    1/WSD/17(L) JV
  • Replacement and repair of water pipe works Phase 4 Phase 2- Islands District water pipe works

    Replace the aged water pipes in the Islands District to improve the condition of the water supply network.
    +more

    15/WSD/11
  • Expansion of Butterfly Valley Fresh Water Main Distribution Reservoir and laying of relevant water pipes

    Expand the storage capacity of the existing Butterfly Valley main drinking water distribution reservoir from 40000 cubic meters to 120000 cubic meters; And the laying of relevant water pipes in Sham Shui Po and Kowloon City with a length of about 900 met
    +more

    4/WSD/11 JV
  • Tai Po Pak Shek Kok Reclamation Water Supply Scheme - Phase 2, Phase 2

    A food water pipe with a length of approximately 2.1 kilometers and a diameter of 600 millimeters is laid between Banchun Garden in Tai Po and Shantang New Village.
    +more

    9/WSD/13 JV
  • Kai Tak Development - North Front Apron Phase 4 Infrastructure

    +more

    KL/2012/03
  • Main infrastructure projects related to the proposed development project in Tung Chung District 56

    Construct a section of carriageway, a Bike lane, a pedestrian path, a relevant roundabout, a channel, auxiliary pedestrian crossing facilities, two refuge places, flower troughs, and carry out ancillary works such as civil engineering, drainage, sewage, w
    +more

    HA20130375
  • Land Leveling and Infrastructure Construction Works at Liantang/Heung Yuen Wai Port - Project Contract 7

    Four vehicular bridges and one pedestrian bridge across Sham Chun River within the Hong Kong Special Administrative Region.
    +more

    NE/2014/03 JV
  • Leveling approximately 1.5 hectares of land and carrying out related infrastructure projects in the 29th district of the Gudong North New Development Zone

    NA
    +more

    NE/2016/04
  • Development of Andashen Road Quarry Land - Pedestrian Link Facility Project Phase 1

    The project mainly constructs pedestrian connection facilities including pedestrian overpass, lift tower and escalator in Kwun Tong District; Construction of bus transfer stations at the toll plaza of the Tseung Kwan O Tunnel; Carry out slope improvement
    +more

    NE/2016/05
  • Demolition of Block B, the former Kennedy Town Married Police Dormitory in Kennedy Town, Hong Kong

    NA
    +more

    SDB807
  • West Kowloon Cultural District Infrastructure Project Phase 1 (Group 1)

    A small but important public infrastructure project to connect with the phased development of the West Kowloon Plan, especially in conjunction with the opening of other facilities in the park, opera center, M+, and art square development area.
    +more

    GW/2015/05/038
  • Slope Maintenance and Improvement Project Term Contract (2019-2022) Zone B

    The slope maintenance and improvement works (including land survey), water leakage inspection and maintenance works determined by the Geotechnical engineering regular service provider through slope inspection and stability evaluation, as well as the emer
    +more

    HA20189126
  • Consolidation works for about 4 government slopes and retaining walls on Hong Kong Island and the New Territories, and landslip risk mitigation works for about 14 natural slopes

    Mainly carrying out reinforcement works for four slopes and retaining walls located on Hong Kong Island and the New Territories; And carry out terrain reduction engineering for 14 natural mountain slopes.
    +more

    GE/2018/01
  • Consolidation of 10 government slopes and retaining walls on Lantau Island and Hong Kong Island and mitigation of landslip risk on 24 natural slopes

    Consolidation works were carried out for 10 government slopes and retaining walls on Lantau Island and Hong Kong Island, and landslip risk mitigation works were carried out for 24 natural slopes.
    +more

    GE/2018/03
  • Long term Prevention and Control of Landslip Project Group M - North Lantau Landslip Prevention and Control Project in 2008

    The project includes a landslide risk reduction project for 13 natural slopes in the north of Lantau Island.
    +more

    GE/2013/17
  • Long term prevention and control of landslides project Group J of 2008- New Territories prevention and control of landslides project

    Consolidating 5 government slopes and retaining walls in the New Territories and mitigating the risk of landslides on 10 natural slopes.
    +more

    GE/2013/06
  • Long term Landslip Control Plan 2009 Group C - Landslip Control Works on Lantau Island and Hei Ling Chau

    Carry out consolidation works for 1 government slope and 14 natural slopes on Lantau Island and Hei Ling Chau to mitigate landslip risk.
    +more

    GE/2012/11
  • Long term Prevention and Control of Landslip Project Group N in 2008- Prevention and Control of Landslip Projects in Deep Bend, Tai O East, Upper Qiang Mountain, and Qiang Shan Road East of West Lantau Island

    NA
    +more

    GE/2013/16